Project References | EAB Engineering

Project References

Scope of work completed successfully

Ocean graphic with subsea equipment.
 
Project Date Location Scope of Supply  
Project FlexConnect  Date 2001 Field or Location Norway and UK Scope of Supply Development, detail engineering, and fabrication of Technip's FlexConnect pull-in system   Subsea equipment used on Flexconnect project. 
Project Kristin Field Date 2004 Field or Location Norway Scope of Supply Six-off SPEMs with Aker RTS porch   Subsea equipment used on Kristin project. 
Project Fram West Field Date 2004 Field or Location Norway Scope of Supply Inline PLEM with cover   Subsea equipment used on Fram West project. 
Project Gryphon Field Date 2005 Field or Location UK Scope of Supply Compact manifold   Subsea equipment used on Gryphon project. 
Project Ormen Lange Field Date 2006 Field or Location Norway Scope of Supply Two-off 30-in PLET modules (135 metric tons each);
One-off 30-in pig loop (90 metric tons) connecting the PLETs;
Two-off 30- and 16-in retrievable tees (30 metric tons)
  Subsea equipment used on Ormen Lange project. 
Project Ringhorne Field Date 2006 Field or Location Norway Scope of Supply Four- and one-off subsea pigging station   Subsea equipment used on Ringhorne project. 
Project Brenda Field Date 2008 Field or Location UK Scope of Supply Manifold protection structure   Subsea equipment used on Brenda project. 
Project Bardawil Field Date 2008 Field or Location Egypt Scope of Supply One-off PLEM;
One-off PLR;
One-off twin inline tee;
One-off protection structure
  Subsea equipment used on Bardawill project. 
Project Draugen FSL  Date 2010 Field or Location Norway Scope of Supply Four-off 18-in horizontal connections;
Four-off 24-in vertical connectors ;
Connection system tooling, including subsea winches;  
Engineering of riser base and PLEMs 
  Subsea equipment used on Draugen FSL project. 
Project Troll B Platform Date 2010 Field or Location Norway Scope of Supply Riser base;
Inline tee;
PLEM with PLR
  Subsea equipment used on Troll B project. 
Project Oselvar Field Date 2011 Field or Location Norway Scope of Supply SSIV with protection structure   Subsea equipment used on Oselvar project. 
Project Marulk Field Date 2011 Field or Location Norway Scope of Supply Inline tee (fast-track project)   Subsea equipment used on Marulk project. 
Project West Delta Phase 8b Project Date 2012 Field or Location Egypt Scope of Supply Two-off HIPPS modules with OneSubsea's CVC vertical collect connection system   Subsea equipment used on West Delta Phase 8b project. 
Project Rogn South,  Draugen Field  Date 2013 Field or Location Norway Scope of Supply One-off tee manifold   Subsea equipment used on Rogn South (Draugen) project. 
Project Knarr Field Date 2013 Field or Location Norway Scope of Supply One-off 12- and 16-in tee;
One-off 16-in PLEM;
One-off 12-in SSIV module
  Subsea equipment used on Knarr project. 
Project West Delta Phase 9a Project  Date 2014 Field or Location Egypt Scope of Supply Six-off HIPPS modules;
Six-off dummy modules;
Twelve-off termination heads;
Connection system
  Subsea equipment used on West Delta Phase 9a project. 
Project Gullfaks Field Wet Gas Compression Date 2014 Field or Location Norway Scope of Supply Pump protection structure (engineering)   Subsea equipment used on Gullfaks WGC project. 
Project Lianzi Field Date 2015 Field or LocationAngola Scope of Supply Engineering and development;
Four-off subsea tree interface tools;
Two-off ROV sampling skid units
  Subsea equipment used on Lianzi project.